Table 6: Annual and daily hysteresis indices
for study watersheds. Annual hysteresis indices were calculated at the
10th (HI10), 25th (HI25), and
50th (HI50) discharge percentiles. Daily hysteresis
indices were calculated for each day during the snowmelt period at the
25th, 50th, and
75th discharge percentiles. We averaged each date’s
hysteresis indices and grouped them by hydrograph period
below.